Case Study
Restructuring the Technology Stack for Elm Projects
A restructuring that lifted team performance by 300% on General Authority of Civil Aviation projects

Context
2 pointsI restructured the technology stack used on GACA projects at Elm, with the aim of raising the efficiency and performance of the development team.
- The technology stack used on Elm's projects for the General Authority of Civil Aviation needed restructuring to improve performance.
- I worked as a senior technical consultant on this project early in my career.
The Challenge
2 points- Identifying the technical bottlenecks that were slowing the development team down.
- Restructuring without affecting the stability of systems already in active use.
Impact & Results
2 points- Team performance increased by 300% after the restructuring.
- A more stable and maintainable technology stack for future GACA projects.
One of the early experiences in my career that cemented my belief that sound technology engineering is a strategic decision serving the whole team, not merely a technical detail.
Have a similar project?
I would be glad to discuss how business driven technology engineering can serve your organisation or your city.
Get in touch










